1000字范文,内容丰富有趣,学习的好帮手!
1000字范文 > 厂房开挖 excavation of powerhouse英语短句 例句大全

厂房开挖 excavation of powerhouse英语短句 例句大全

时间:2022-07-05 08:31:08

相关推荐

厂房开挖 excavation of powerhouse英语短句 例句大全

厂房开挖,excavation of powerhouse

1)excavation of powerhouse厂房开挖

英文短句/例句

1.The Key Technologies in the Excavation Construction of Huge Underground Powerhouse;大型地下厂房开挖施工中的关键技术问题研究

2.Numerical Simulation and Study on Blasting Excavation of Underground Powerhouse of Hydropower Station;水电站地下厂房开挖爆破数值模拟与研究

3.Numerical Simulation on Excavation Process of Large-scale Underground Powerhouses with FEM;大跨度地下厂房开挖过程的有限元数值模拟

4.The Construction Method Proposal Study on the Excavation and Supporting & Protection Works for Powerhouse of Liuhong Hydropower Station;柳洪电站主副厂房开挖与支护施工方案研究

5.A Deforming Characteristic Evaluation of Excavating Underground Hydropower Station on the Right Bank of the Three Gorges Project;三峡地下电站主厂房开挖变形特性分析

6.Study of Prediction on Feedback Calculation of Excavated Monitor to Xiluodu Underground Powerhouse溪洛渡地下厂房开挖反馈计算及预测研究

7.Key Construction Technology of Excavation and Support of Underground Powerhouse in Tongbai Hydroelectric Project桐柏电站地下厂房开挖支护关键施工技术

8.3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究

9.Numerical Simulation Analysis on Influence of Blasting Excavation in Main Underground Powerhouse to Adjacent Cavities;地下厂房开挖爆破振动对周边群洞影响的数值模拟分析

10.The Effect of Underground Plant s Excavation on the Anti-sliding Stability of BaiShan Arch Dam;白山大坝地下厂房开挖对建基面抗滑稳定性的影响分析

11.KEY CONTROL TECHNOLOGIES OF EXCAVATION BLASTING VIBRATION FOR UNDERGROUND POWERHOUSE OF XIANGJIABA HYDROELECTRIC STATION向家坝电站地下厂房开挖爆破振动控制关键技术

12.Characteristic analysis of excavation unloading deformation and anchor stress for underground powerhouse of Pushihe pumped storage power station蒲石河蓄能电站地下厂房开挖卸荷变形及锚杆应力特性分析

13.Test and Study on Effect of Blasting Vibration in Underground Powerhouse Excavation at Xiaowan Hydropower Station小湾水电站地下厂房开挖爆破振动效应测试与研究

14.Excavation and Support of Underground Powerhouse of Jiangsu Yixing Pumped-storage Power Station江苏宜兴抽水蓄能电站地下厂房开挖及支护施工

15.Study on Construction Procedure and Excavation Method of the Large Underground Powerhouse;大型地下厂房施工程序及开挖方法研究

16.Blasting Excavation Experiment of Cliff Rock-bolt Beam in Underground Power House of Guandi Hydropower Station官地地下厂房岩锚梁岩台开挖爆破试验

17.The Excavation Methods of Main-transformed Cavern of Underground Powerhouse of Baise Water Conservation Junction百色水利枢纽地下厂房工程主变洞的开挖方法

18.Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station向家坝电站地下厂房系统洞室开挖方法

相关短句/例句

Workshop[英]["w?:k??p][美]["w?k"?ɑp]厂房

1.Application of the hot rolled H-shaped steel in the large industrial workshops;热轧H型钢在大型工业厂房中的应用

2.Simply discussing on the fireproofing design of steel structure workshop;浅谈钢结构厂房防火设计

3.Safety and environmental protection in demolition blasting of the large sintering workshop;大型烧结厂房爆破拆除安全环保技术研究

3)factory building厂房

1.Application of probabilistic limit state design method to anti-slide stability analysis offactory building;概率极限状态设计法在厂房抗滑稳定分析中的应用

2.The sunk construction of whirl well of adjacentfactory building;毗连厂房旋流井沉井施工

3.The selection of slabs infactory building with multilayer steel structure;多层钢结构厂房楼板的选择

4)powerhouse[英]["pa??ha?s][美]["pau?"haus]厂房

1.Integral seismic response analysis of concrete dam andpowerhouse at dam toe;混凝土坝及坝后式厂房整体地震响应分析

2.Powerhouse integral stability and foundation stress calculation for Xiafu HPP;下福水利枢纽厂房整体稳定及地基应力计算

3.Research on dynamic response ofpowerhouse structure of Yixing Pumped-storage Project宜兴抽水蓄能电站厂房结构水力振动反应分析

5)power house厂房

1.Research on vibration influence of mainpower house induced by increment of capacity of hydrogenerating unit and improvement;水轮发电机增容改造对主厂房的振动影响研究

2.Application of vibroflotation to foundation consolidation forpower house of Hongye Hydropower Station II;振冲法在红叶二级水电站厂房地基加固中的应用

3.Dynamic identification for undergroundpower house based on genetic algorithm;基于遗传算法的地下发电厂房动态识别

6)building[英]["b?ld??][美]["b?ld??]厂房

1.It is analyzed in detail that some load characteristics and abutment connecting structure design of I-steel crane beam in metallurgicalbuilding.对双层翼缘板焊接工型钢吊车梁的某些受力特征、吊车梁的支座节点连接构造设计等进行了较详尽的分析,提出了满足冶金工业厂房大跨度、大吨位吊车梁系统受力和工艺要求的方法。

2.The main points in design,construction and maintenance of light-steel structurebuilding of cotton mill are discussed.介绍了轻型钢结构概念 ,总结了轻型钢结构的优点 ,探讨了轻型钢结构在纺织工业厂房设计、施工中的使用要

3.According to the analysis and calculation of the collapse accident occurring in the construction of some steel structurebuilding, it shows that to ensure the integral stability in the construction of the light-weight steel structurebuilding with large spans is very important.对某钢结构厂房施工过程发生倒塌事故的结构分析与计算表明,大跨度轻钢结构厂房施工中保证结构整体稳定至关重要。

延伸阅读

厂房1.无隔墙的房屋。 2.工场或工厂的房屋。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。